Minggu, 07 Oktober 2012

The Flood In Bekasi

Rainy season from October 2011 until February 2012 has ended, but as we know it’s still, every day in Bekasi flushed the rain. Duringrainy season, there was flooding everywhere. This proves that local governments have not been serious in tackling the problem of flooding in the local area. Garbage caught in the dam Bekasi river reach 300-400 tons. Derived from the upstream watershed or river das Cilengsi and Cikeas Bogor. This occurs because the increase in flow of river water discharge and Cikeas Cilengsi bring a lot of garbage that has piled up in the summer.

According to an official observer Bekasi river dam water, like these things happen only once, after that no longer exists because of the floods washed out. Currently only the status is ready. In anticipation of flooding, it has established communication with the Upper River officers to Cullinan and Cikeas monitoring. Flood prone areas affected include Housing of Kemang Pratama, Pondok Lestari Partners, Villa Nusa Indah and Kemang Ipi, a number of areas that have a pool, among others, at the junction of Jalan Juanda Bekasi Station, Market Project, a long and complex Bekasi government offices.
The puddle was found in Bekasi Square, New Road Underpass, Indah Jaya Complex Bekasi Nagging, Margahayu, and SDN Duren Jaya VII. "If you want to say cheated, yes it could be. During this time we focus on flood management that often hit the housing on the banks of Kali Bekasi. Turned out yesterday that it was not flooded at these locations, Currently taking place concerning the normalization of garbage in Jakarta dam sluice gates by the water company Aetra and Palyja from Jakarta who use river water as a raw material that they manage piped water. Chairman of Commission B DPRD Bekasi, Ronny Hermawan, saying it can not be seen from the proposed establishment of drainage as a solution to alleviate flooding in the local area in 2012. "The campaign of 2012 that we instigated drainage by adding the composition of the budget for drainage on Disbimarta not also altered and revised by the Jakarta City Government. So in conclusion, people should be prepared for flooding this year. When in drainage materialize, he said, the composition of the original budget for the drainage in 2011 only 11 percent of the total budget in Disbimarta, then in 2012 will be increased at least 30 percent of the total budget of Rp280 billion. According to Ronny, in 2010 and 2011, the budget in Disbimarta reached Rp150 billion, second highest after the education budget. However, the allocation for the construction of drainage is 20 percent, while the rest is used for roads. Allocation should be comparable, because the roads and waterways can not be separated. "The road was built but it's always flooded, it will not last long. So instead didn’t save budget only. But if you built a good drainage so the roads are also to be preserved, "said the politician from the Democratic Party. He is optimistic that, if the policy is carried out within three years the city of Jakarta will be free from flooding problems. Another benefit is the road infrastructure to be more durable. I believe if we are consistent, then the flooding problem can be solved within three years. We try next year and I ask that the public support that materialized in 2013,

Tidak ada komentar:

Posting Komentar